Fingers Crossed for 2021 ...

2020 was the worst! COVID kept the museum closed for much of the year and a mains water pipe bursting causing a flood kept us closed for the rest. 
We're hoping to re-open in the next few months ... fingers crossed! Read More >>>

Please Donate Via Just GivingNo visitors, no workshops, no events, no school visits... no income. We know that things are tough for everyone right now, but if you can afford to help us through these tough times please donate what you can.

There's over 36,000 exhibits here! That should keep you occupied for a bit - get searching!

Or come and get involved on our social media channels ...

      Twitch  Facebook          Online Gift Shop      

Thank you.

 Home > LEO Computers > Lyons Electronic Office (LEO) Archive > CMLEO/DC - David Caminer Papers > Working Files > LEO jobs - M1 > 56592 M1 Serial 3: LE ... perating Instructions
 

56592 M1 Serial 3: LEO II Test Programme Operating Instructions

Operating Instructions and procedures for the LEO II M1/3 Test Programme. Comprises:
- Halt Code Location/Error Location lists;
- Programme Control Constants (2447 M.);
- Section References (2447 M.);
- Inter Stage References (2447 M.);
- Patterns ref M1/2 section 4 (2858 M(A));
- Order Constants. Ref M1/2 (2447 M.);
- Preparatory (2447 M.);
- Test + and - sequence change 4.0.2 & 4.0.3. Ref M1/4 (2447 M.);
- Test + and - sequence change 4.0.2 & 4.0.3. Ref M1/5 (2447 M.);
- Test non-zero sequence change 4.0.1. Ref M1/6 (2447 M.);
- Test non-zero sequence change 4.0.1. Ref M1/7 (2447 M.);
- Test zero sequence change 4.0.0. Ref M1/8 (2447 M.);
- Test zero sequence change 4.0.0. Ref M1/9 (2447 M.);
- Shift test, positive. Ref M1/10 (2447 M.);
- Shift test, positive. Ref M1/11 (2447 M.);
- Shift test, positive. Ref M1/12 (2447 M.);
- Shift test, positive. Ref M1(B) (2447 M.);
- Shift test, negative. Ref M1/14 (2447 M.);
- Shift test, negative. Ref M1/15 (2447 M.);
- Shift test, negative. Ref M1/16 (2447 M.);
- Shift test, negative. Ref M1/17 (2447 M.);
- Shift test, negative. Ref M1/18 (2447 M.);
- Shift test, negative. Ref M1/19 (2447 M.);
- Shift test, negative. Ref M1/20 (2447 M.);
- Shift test: test suppression at bottom of R8 and top of R9. Ref M1/21 (2447 M.);
- D20 suppression test. Ref M1/22 (2447 M.);
- Test add/transfer short. Ref M1/23 (2447 M.);
- Test add/transfer long. Ref M1/24 (2447 M.);
- Test positive multiplication (23/13) long multiplier. Ref M1/25 (2447 M.);
- Test positive multiplication (23/13) long multiplier. Ref M1/26 (2447 M.);
- Test positive multiplication (23/13) long multiplier. Ref M1/27 (2447 M.);
- Test positive multiplication (23/13) long multiplier. Ref M1/28 (2447 M.);
- End sign. Ref M1/End.
- Test positive multiplication (23/13) short multiplier. Ref M1/29 (2447 M.);
- Test positive multiplication (23/13) short multiplier. Ref M1/30 (2447 M.);
- Test positive multiplication (23/13) short multiplier. Ref M1/31 (2447 M.);
- Test positive multiplication (23/13) short multiplier. Ref M1/32 (2447 M.);
- Test negative multiplication (23/15) long multiplier. Ref M1/33 (2447 M.);
- Test negative multiplication (23/15) long multiplier. Ref M1/34 (2447 M.);
- Test negative multiplication (23/15) long multiplier. Ref M1/35 (2447 M.);
- Test negative multiplication (23/15) long multiplier. Ref M1/36 (2447 M.);
- Test negative multiplication (23/15) short multiplier. Ref M1/37 (2447 M.);
- Test negative multiplication (23/15) short multiplier. Ref M1/38 (2447 M.);
- Test negative multiplication (23/15) short multiplier. Ref M1/39 (2447 M.);
- Test negative multiplication (23/15) short multiplier. Ref M1/40 (2447 M.);
- Test round off (12.1). Ref M1/41 (2447 M.);
- Test collation (23/25). Ref M1/42 (2447 M.);
- Test collation (23/25). Ref M1/43 (2447 M.);
- SR1 Positive multiplication long multiplier (23/13/12). Ref M1/SR1 (2447 M.);
- SR2 Positive multiplication long multiplier (23/13). Ref M1/SR2 (2447 M.);
- SR3 Positive multiplication long multiplier (23/15/12.0.1). Ref M1/SR3 (2447 M.);

- SR4 Negative multiplication short multiplier (23/15). Ref M1/SR4 (2447 M.).

The draft version of this file is also held in the archive: CMLEO/DC/WF/LM1/3

Date : Undated (c1957)

Physical Description : 1 file (65 pages), paper: typescript

Provenance :
From David Caminer's papers. Originally filed with LEO Flowchart tracings, 1953-4 (CMLEO/DC/WF/PRG/13; DTC/1/4/2).



Archive References : CMLEO/DC/WF/LM1/2 , DTC/1/4 (part 1)

This exhibit has a reference ID of CH56592. Please quote this reference ID in any communication with the Centre for Computing History.
 
Article: 56592 M1 Serial 3: LEO II Test Programme Operating Instructions

This document has been scanned and is available to view online.
Copyright
Lyons
File Size: 5.81 MB






Help support the museum by buying from the museum shop

View all items

Founding Sponsors
redgate Google ARM Real VNC Microsoft Research
Heritage Lottery Funded
Heritage Lottery Fund
Accredited Museum